Robert Hahn walks deeper into the 600 m long diversion (box) dam at the site of Dam #6 on the Nam Ou River, Laos. The river would be diverted into this tunnel six days later (27 January 2014) to allow construction of the dam across the original river channel.
Size: 5616px × 3744px
Location: N/A, Phongsaly, Laos
Photo credit: © Ethan Welty / Alamy / Afripics
License: Royalty Free
Model Released: Yes
Keywords: 30-34, 6, adult, caucasian, construction, dam, day, development, diminishing, diversion, ethnicity, full, hardhat, horizontal, illuminated, indoors, laos, length, man, mid, nam, ou, person, perspective, phongsaly, rear, river, site, tunnel, view, walking, years