. Railway mechanical engineer . the roadbed conditions outlined veloped a much higher drawbar pull than was guaranteedby the builders. They consist of two units, each of the2-4-4-2 type and weighing 13S tons, the total weight being270 tons. The tables show their principal dimensions andperformances. Length overall 105 ft. 8 in. Driving wheel base, total .S3 ft. 10 in. Rigid wheel base 11 ft. 0 in. Truck wheel base 16 ft. 6 in. Height, rail tn pantagraph (locked) 16 ft. 0 in. Height, rail to top of cab (maximum) 14 ft. 9 in. Width overall (maximum) 11 ft. 6A in. Width over cab body 10 ft. 3 in.


. Railway mechanical engineer . the roadbed conditions outlined veloped a much higher drawbar pull than was guaranteedby the builders. They consist of two units, each of the2-4-4-2 type and weighing 13S tons, the total weight being270 tons. The tables show their principal dimensions andperformances. Length overall 105 ft. 8 in. Driving wheel base, total .S3 ft. 10 in. Rigid wheel base 11 ft. 0 in. Truck wheel base 16 ft. 6 in. Height, rail tn pantagraph (locked) 16 ft. 0 in. Height, rail to top of cab (maximum) 14 ft. 9 in. Width overall (maximum) 11 ft. 6A in. Width over cab body 10 ft. 3 in. Diameter of driving wheels 62 in. Diameter of truck wheels 30 in. Weight on drivers 220 tons Total weight of locomotive 270 tons Train on Train on Train on and J 1 per centgrade Weight of trains, tons 3,250 Locomotives per train - Approximate speed, miles per hour 14 Drawbar pull per locomotive, pounds: Uniform acceleration 91,800 114,000 Up to Officeand Locker Room per centgrade3,250 1 per centgrade3,2501 14 28 Plan of Locomotive Inspection Building at Bluestone, Showing Location of Inspection Pits and Machine Tools above, together with the fact that the average eastboundtraffic, at the present time, is about 35,000 tons per day,with 3,250 tons per train, it is easy to understand why thehigh voltage overhead trolley system was chosen. The sys-tem finally installed is known as the single-phase, 11,000-volt trolley system, which consists of an 11,000-volt catenary-suspended trolley, from which current is collected by abow pantagraph on the locomotive. A transformer carriedin the locomotive cab transforms the voltage from 11,000 to750 and a phase converter, operating at the latter voltage,furnishes three-phase current to the wound-rotor inductionmotors, of which there are eight on each locomotive. Thesystem operates at 25 cycles. The motors are wound fortwo synchronous speeds, 14 and 28 miles per hour, and arestarted by inserting water rheostats in series with th


Size: 2222px × 1125px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1900, bookdecade1910, booksubjectrailroadengineering