Tuberculosis hospital and sanatorium construction; . No. 22.—Eudowood Sanatorium, Towson, Md. Archer & Allen, Architects. The Administra-tion, Recreation. Infirmary and Service Buildings. View of Front Elevation and FloorPlans. Administrative Capacity, too Patients. Estimated Cost, $60,000. (See illustrations 61and 83 for further description of this institution.) 55 Section II ( together. The extensions are constructed of frame, covered with shingles that har-monize with the exterior of the main section, and the windows of the entire building arefitted on the outside with slat blinds i


Tuberculosis hospital and sanatorium construction; . No. 22.—Eudowood Sanatorium, Towson, Md. Archer & Allen, Architects. The Administra-tion, Recreation. Infirmary and Service Buildings. View of Front Elevation and FloorPlans. Administrative Capacity, too Patients. Estimated Cost, $60,000. (See illustrations 61and 83 for further description of this institution.) 55 Section II ( together. The extensions are constructed of frame, covered with shingles that har-monize with the exterior of the main section, and the windows of the entire building arefitted on the outside with slat blinds in order to shut out the heat and light during thesunnncr. During the remodeling there was also installed a central hot water vacuumplant to heat the entire structure. These improvements have resulted in providing a group of buildings extendingfrom one centre and admirably adapted to the requirements. They have also doubledthe previous administrative facilities, there now being a capacity for one hundred patients,at a cost of about 850,000. Ma


Size: 1904px × 1312px
Photo credit: © The Reading Room / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1900, bookdecade1910, bookpu, booksubjecthealthresorts