Rearrangement of the Oosterspoorweg between the Muidertrekvaart and the Weesp station Description: Construction of a high fixed bridge over the canal. View from a point east of the extended axis der bridge Date: 26 april 1889 Location: Noord-Holland, Weesp, Weesp Keywords: channels, railway bridges, hydraulic engineering


Size: 3080px × 2272px
Photo credit: © BNA Photographic / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: