The final Air Force C-17 Globemaster III, P-223, is rolled off the Boeing assembly line and placed on the flight line durin


The final Air Force C-17 Globemaster III, P-223, is rolled off the Boeing assembly line and placed on the flight line during a ceremony celebrating 20 years of delivering C-17s to the Air Force Sept. 12, 2013, at Long Beach, Calif. The C-17 was flown from California to Joint Base Charleston, , by pilots to include Gen. Paul Selva, Air Mobility Command commander, Lt. Gen. James Jackson, Air Force Reserve commander, and Lt. Gen. Stanley Clarke, Air National Guard director. This historical event comes more than 20 years after the 437th Airlift Wing and the 315th Airlift Wing took delivery of the very first C-17 to enter the Air Force inventory June 14, 1993, and marks the successful completion of C-17 production for the Air Force.


Size: 6905px × 4259px
Photo credit: © MixPix / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: -223, -17, -17s, -2, .., 12, 20, 2013, air, assembly, base, beach, boeing, calif., california, celebrating, ceremony, charlesto, delivering, final, flight, flown, force, globemaster, iii, joint, line, long, rolled, sept., usaf, years