The Everglades Agricultural Area (EAA) Reservoirs construction site. This section of the reservoir foundation is compressed and shaped. The sediment used to form the foundation is taken from the project site. The overarching goal of the Central Everglades Planning Project (CEPP) is to improve the quantity, quality, timing, and distribution of water flows to the Everglades, Water Conservation Area 3 (WCA-3) and Everglades National Park (ENP). The purpose of the Central Everglades Planning Project (CEPP) Everglades Agricultural Area (EAA) Reservoir Phase is to construct a 240,000 acre-foot


The Everglades Agricultural Area (EAA) Reservoirs construction site. This section of the reservoir foundation is compressed and shaped. The sediment used to form the foundation is taken from the project site. The overarching goal of the Central Everglades Planning Project (CEPP) is to improve the quantity, quality, timing, and distribution of water flows to the Everglades, Water Conservation Area 3 (WCA-3) and Everglades National Park (ENP). The purpose of the Central Everglades Planning Project (CEPP) Everglades Agricultural Area (EAA) Reservoir Phase is to construct a 240,000 acre-foot EAA reservoir and 6,500 acre-foot stormwater treatment area, and integrate with A-1 FEB operations. ( Army Photo by Brigida I. Sanchez)


Size: 4500px × 3000px
Photo credit: © APFootage / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: