. American engineer . eading from the turntable pit also passes tlirougli tliisshop and lias a turntable connection with llie industrial trackpassing along the south side of the l)uilding, as shown on thegeneral plan on the opposite page. All metal working tools are located in the end of the build-ing nearest the locomotive shops and here all ash pans arerepaired and tlic plates fabricated for use in repairs to tanksor steel unilerfranuS. The machinery in this section, like the cuds. The trestles, sliown in one of the dhistratii-iis, are))uilt of rails, base upward, set in cast iron pedestals
. American engineer . eading from the turntable pit also passes tlirougli tliisshop and lias a turntable connection with llie industrial trackpassing along the south side of the l)uilding, as shown on thegeneral plan on the opposite page. All metal working tools are located in the end of the build-ing nearest the locomotive shops and here all ash pans arerepaired and tlic plates fabricated for use in repairs to tanksor steel unilerfranuS. The machinery in this section, like the cuds. The trestles, sliown in one of the dhistratii-iis, are))uilt of rails, base upward, set in cast iron pedestals locatedabout six feet apart. Here tlie tanks are completely repairedand painted. Beyond this is a space which accommodatesabout 20 undcrframes which are set on wooden trestles, leav-ing an aisle in the center and at either end. This accountsfor the shop space ud to the place where the transverse trackfrom the turntable enters. Beyond this track are four setsof rails imbedded in the floor on which all truck repairs are. Plan and Tool Location; Tank, Cab and Pilot Shop. all other constant speed machines in the shop, is driven bydirect connected induction motors. The size of machinesand motors is given in the following table: Machine. Motor. Small rolls 7A h. p. Shear, Long & Alstatter No. 2 7J4 h. p. Punch, Long & Alstatter No. 2. .. ._. 7A h. p. Spacing punch. Long & Alstatter No. 2 7J<; h. p. Large bending rolls 7 J-2 h. p. In addition there are the open fires, face plates, small flang-ing clamps and benches required for work of this floor is of concrete throughout the building and amplespace is provided for the storage of a sufficient stock ofplates, angles, etc. The ash pans are repaired on the open floor; only those onwdiich actual work is being performed are within the build-ing; those waiting for repairs are stored outside alongsidethe entering track. The sheets and angles are sheared,punched and formed on the different machines and rivetingis done with an
Size: 3277px × 763px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: ., bookcentury1900, bookdecade1910, booksubjectrailroa, bookyear1912