"Image shows a portable pontoon bridge being installed by the Engineers during World War One. This bridge was successfully placed under enemy fire over Canal de L'est near Dun-sur-Meuse, France. It took the Engineers twenty-six hours to complete the installation, enabling Infantry to cross. Photo: ECD 2-2649."
Size: 8457px × 5613px
Photo credit: © piemags/NSC / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: 111-sc, 111-sc-38731, 2-2649, action, activities, american, army, bridge, canal, combat, construction, cross, crossing, de, dept., documented, dunsur, ecd, engineering, engineers, engr., equipment, eu, expeditionary, fire, forces, france, historical, history, infantry, logistics, meuse, military, official, operations, photographer, photographs, poot, portable, river, soldiers, strategy, tactics, transport, trenches, troops, war, warfare, weapons, world