. Electric railway journal . en completed, five of thesix new substations have beenbuilt, and 85 per cent of thetransmission - line ducts andcables have been installed dur-ing the present year. nTRECT-CUKRENT POWER GENERA-TION The oldest power station ofthe company is the Allston sta-tion in the town of Brighton,which was built in 1888 tosupply current for the firstelectric line in the Boston dis-trict, opened between Brook-line and Boston in January,1889. This station has beenenlarged and remodeled fromtime to time, but has never beenmodernized. At the presenttime it contains eight 80-kwgener


. Electric railway journal . en completed, five of thesix new substations have beenbuilt, and 85 per cent of thetransmission - line ducts andcables have been installed dur-ing the present year. nTRECT-CUKRENT POWER GENERA-TION The oldest power station ofthe company is the Allston sta-tion in the town of Brighton,which was built in 1888 tosupply current for the firstelectric line in the Boston dis-trict, opened between Brook-line and Boston in January,1889. This station has beenenlarged and remodeled fromtime to time, but has never beenmodernized. At the presenttime it contains eight 80-kwgenerators and four 62-kwgenerators belt-driven by high-speed, compound, non-condensingeral years it has been operatedwhen the heaviest loads are carried. The East Boston power station supplies power for thelines in East Boston and Chelsea which use the tunnel underthe harbor. It contains three 200-kw generators direct-connected to horizontal, cross-compound, condensing en-gines. A new substation has been built on adjoining prop-. Boston Elevated Power—Effect of Temperature on Power Station Load engines. Eor sev-only in the the substationat Coolidge Corner, Brookline, has been started up, thisold station will be shut down and entirely dismantled.


Size: 1903px × 1313px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1900, bookdecade1900, bookpublishernewyorkmcgrawhillp