Highways Agency built Cable Stayed steel footbridge cycle and footway over A14 at Bar Hill , Cambridgeshire, Cambs, England, uk


A couple of 'firsts' for Knight Architects. Our first Highways England project to be on site and our first cable stayed footbridges. The new bridges at Bar Hill and Swavesey will bring important and sustainable connectivity to local communities. Conceived as a pair of structures, the tower forms provide a gateway to the A14 corridor and identity to the surrounding with Atkins and Skanska the design provided significant savings for the client whilst maintaining the original aspirations for high quality design


Size: 5184px × 3456px
Location: A14 bar hill, cambridgeshire, england, uk
Photo credit: © Colin Palmer Photography / Alamy / Afripics
License: Royalty Free
Model Released: No

Keywords: 2020, a14, a14 architecture bar, agency, architect, architects, artificial, atkins, bar, bridge, british, builders, cable, cables, cambridgeshire, cambs, complete, cycleway, design, dry engineering fo, engineering, engineering day, engineers, england, gate, gateway, gb, highways, hill, hill bridge built, knight, lake, link, overbridge, picker concrete construction cranecivil, road, schedule, skanska, stayed, steel, structure, structure cambridge challenge cherry, summer, tall, uk, white, ws