. The Street railway journal . BROKEN JOINT ON SHALLOW RAIL, WORCESTER ELECTRICALLY-BRAZED COPPER CONNECTION Wherever joints have broken, in no case have they pulled apart considering the fact that 5308 were welded in 1901 and have donemore than 2 ins. This would seem to show that the pull which service through two winters. The majority of the breaks occurred 522 STREET RAILWAY JOURNAL. [Vol. XXII. No. n. during the winter months, and especially during sudden ^changesof temperature. In addition to the welding of track, we run 1,000,000 C. M. cablethrough all special work and to connect to O. H


. The Street railway journal . BROKEN JOINT ON SHALLOW RAIL, WORCESTER ELECTRICALLY-BRAZED COPPER CONNECTION Wherever joints have broken, in no case have they pulled apart considering the fact that 5308 were welded in 1901 and have donemore than 2 ins. This would seem to show that the pull which service through two winters. The majority of the breaks occurred 522 STREET RAILWAY JOURNAL. [Vol. XXII. No. n. during the winter months, and especially during sudden ^changesof temperature. In addition to the welding of track, we run 1,000,000 C. M. cablethrough all special work and to connect to O. H. negative feed-ers, using the Lorain Steel Companys electrically brazed connec- pair bills for track and equipment, and lessening the electricallosses. From the experience of Buffalo and Rochester, N. Y., andColumbus, Ohio, where new track has been welded, it would ap-.


Size: 1443px × 1732px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1800, bookdecade1880, booksubjectstreetr, bookyear1884