Construction of a new line route, 380 KV extra-high voltage line between Osterath and Gohr, near Neuss, fitters in line trolleys, on the ladder cables
Construction of a new line route, 380 KV extra-high voltage line between Osterath and Gohr, near Neuss, fitters in line trolleys, on the ladder cables, installing field spacers at great heights, wind power plant, NRW, Germany,
Size: 7952px × 5304px
Photo credit: © Jochen Tack / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: 380, alternative, amprion, assembly, blades, cables, conductor, construction, damping, electricity, energy, erect, erection, extra-high, farm, field, fitter, fitters, generator, generators, grid, height, high, infrastructure, kilovolt, kv, line, lines, network, neuss, operator, overhead, plant, power, propellers, pylons, regenerative, renewable, rhineland, rotors, route, site, skilled, spacer, station, supply, transmission, trolley, turbine, turbines, voltage, wea, wind, windmill, workers