. The Street railway journal . with the American Bridge Company. The builders, there-fore, attempted, to prevent the use of the bridge until settlement had beenmade. The car displayed the sign United States mail, but a chain blockedthe way and a watchman endeavored to prevent the passage of the car. Hewas overpowered and the car continued to run throughout the day. Regularoperation will probably start immediately. TOLEDO, OHIO.—Track laying on the Toledo, Port Clinton & Lakeside isbeing pushed, and it is expected that a portion of the road will be placed inoperation this fall. The power house
. The Street railway journal . with the American Bridge Company. The builders, there-fore, attempted, to prevent the use of the bridge until settlement had beenmade. The car displayed the sign United States mail, but a chain blockedthe way and a watchman endeavored to prevent the passage of the car. Hewas overpowered and the car continued to run throughout the day. Regularoperation will probably start immediately. TOLEDO, OHIO.—Track laying on the Toledo, Port Clinton & Lakeside isbeing pushed, and it is expected that a portion of the road will be placed inoperation this fall. The power house at Genoa is almost completed. TOLEDO, OHIO.—The Toledo Railways & Light Company has placed con-tracts for the erection of a large brick car house and repair shop. The build-ing will be located in East Toledo on the Starr Avenue line, and will beSO ft. x 240 ft. The structure will be erected on the same general plan as thenew car houses on Central Avenue, which were recently illustrated in theStreet Railway Manufacturers Iron and Steel JUBULAR POLES m • ^tric Railway villiI mm •>.v < 1 mmm l Lighting andtelephone Service i^^^-^RAGKpTSPlain and Flexibletypes Hi OVERHEAD LI/NE ft-; of every description
Size: 2205px × 1133px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: ., bookcentury1800, bookdecade1880, booksubjectstreetr, bookyear1884