. Railway and locomotive engineering : a practical journal of railway motive power and rolling stock . THIS VEW SHOWS THE POSITION OF VALVES AND 25 WHEN THE BRAKE CYLINDER PRESSUREIS NEARLY DEPLETED,OTHERWISE THE TWOWEIGHTED VALVES 19 AND 22 SHOULD BE SHOWNIN THEIR OTHER POSITIONS AND THE REDUCTIONRESERVOIR CHECK VALVE 25 CLOSEO EMPTY AND LOAD EQUIPMENT WITH FOUR COMPRESSOR RESERVOIRS. NORMAL RELEASEAND CHANGING POSITION. CHANGE AND VALVE IN LOAD POSITION. 294 RAILWAY AND LOCOMOTIVE ENGINEERING. August, same work of any other K triple valvewhen working with the cut-out valve inem
. Railway and locomotive engineering : a practical journal of railway motive power and rolling stock . THIS VEW SHOWS THE POSITION OF VALVES AND 25 WHEN THE BRAKE CYLINDER PRESSUREIS NEARLY DEPLETED,OTHERWISE THE TWOWEIGHTED VALVES 19 AND 22 SHOULD BE SHOWNIN THEIR OTHER POSITIONS AND THE REDUCTIONRESERVOIR CHECK VALVE 25 CLOSEO EMPTY AND LOAD EQUIPMENT WITH FOUR COMPRESSOR RESERVOIRS. NORMAL RELEASEAND CHANGING POSITION. CHANGE AND VALVE IN LOAD POSITION. 294 RAILWAY AND LOCOMOTIVE ENGINEERING. August, same work of any other K triple valvewhen working with the cut-out valve inempty position and when in load positionprovision is made for charging twosmaller reservoirs and controlling aslightly increased volume of compressedair in the same length of time as when inempty position. In empty position, the load brake cyl- inder, the load reservoir of 550 cu. , the take up reservoir of 160 , and the reduction reservoir of 550cu. ins., are at all times open to theatmosphere, and in either empty or loadposition and at all times the equipment ischarged, the chamber F, in which thecut-out slide valve operates, is suppliedwith compressed air from the triple valve so that the slide valve is at all times heldto its seat and the pressure equalizes onboth sides of the cut-out piston when inempty position. The object of the load reservoir is tostore an additional auxiliary reservoirvolume for the operation of the loadbrake cylinder. The object of the take up reservoir is August, 1
Size: 1279px × 1953px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: ., bookcentury1900, bookdecade1900, booksubjectrailroa, bookyear1901