. Railroad structures and estimates . 50 52 52 54 54 56 56 58 58 60 60 162 CONCRETE ARCH CULVERTS. Concrete Arch Culverts. (Fig. 52.) —Mixture: One cement,


. Railroad structures and estimates . 50 52 52 54 54 56 56 58 58 60 60 162 CONCRETE ARCH CULVERTS. Concrete Arch Culverts. (Fig. 52.) —Mixture: One cement,3 sand and 5 broken stone. Excavating, laying, and refillingextra. See Table 79. Settlement. — In places where settlement is likely to occurbuild in 8 or 10-foot lengths, separated with a heavy layer oftarred felt. Joints to be vertical and the width of base increased. No filling to be done before concrete has thoroughly set, theminimum time allowed being two weeks. Material up to this line includedI in quantities for End Walls !.


Size: 1608px × 1553px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookauthororrockjohnwilson1870, bookcentury1900, bookdecade1910