KENNEDY SPACE CENTER, Fla. - Workers in the Vertical Processing Facility check out equipment that is part of the payload for the Hubble Servicing Mission, STS-109. The primary servicing tasks of the mission are to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the Advanced Camera for Surveys, install the NICMOS Cooling System, and install New Outer Blanket Insulation on bays 5 through 8. Mission STS-109 is scheduled for launch in mid-February 2002


Size: 3000px × 2167px
Photo credit: © NASA/piemags / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: .