An electric vehicle charger is stationed outside the 436th Civil Engineer Squadron at Dover Air Force Base, Delaware, Feb. 29, 2024. Team Dover’s switch to EV’s began in November 2022 and is currently in phase three of the five-phase process; it is anticipated to be completed by the end of 2024. Air Force


Size: 4935px × 3283px
Photo credit: © Operation 2024 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: 436th, afb, airlift, dover, electric, vehicle, wing