150818-N-CG436-227 CHARLESTOWN, Mass (Aug. 18, 2015) Seabee divers with Construction Dive Detachment Alfa (CDD/A) of Underwater Construction Team (UCT) ONE approach a port security barrier (PSB) mooring system to conduct an underwater inspection at the Charlestown Navy Yard. This particular PSB acts as a buffer between the USS Constitution and the rest of the harbor. The purpose of the inspection is to verify the structural integrity of the mooring chains. UCT ONE deploys around the world to conduct underwater construction, inspection, repair and demolition operations in support of both peacet


150818-N-CG436-227 CHARLESTOWN, Mass (Aug. 18, 2015) Seabee divers with Construction Dive Detachment Alfa (CDD/A) of Underwater Construction Team (UCT) ONE approach a port security barrier (PSB) mooring system to conduct an underwater inspection at the Charlestown Navy Yard. This particular PSB acts as a buffer between the USS Constitution and the rest of the harbor. The purpose of the inspection is to verify the structural integrity of the mooring chains. UCT ONE deploys around the world to conduct underwater construction, inspection, repair and demolition operations in support of both peacetime and wartime missions. ( Navy photo by Mass Communication Specialist 2nd Class Michael Scichilone/Released)


Size: 4928px × 3280px
Photo credit: © AB Forces News Collection / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: 1, anchor, antiterrorism, atop, barrier, boston, bulk, chain, charlestown, constitution, construction, dive, divers, diving, dvids, force, import, inspection, mooring, nmcs, operations, port, protection, psb, seabee, seabees, security, team, uct, underwater, uss