Construction of a new line route, 380 KV extra-high voltage line between Osterath and Gohr, near Neuss, fitters in line trolleys, on the ladder cables
Construction of a new line route, 380 KV extra-high voltage line between Osterath and Gohr, near Neuss, fitters in line trolleys, on the ladder cables, installing field spacers at great heights, solar park on a disused landfill site, NRW, Germany,
Size: 7952px × 5304px
Photo credit: © Jochen Tack / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: 380, amprion, assembly, building, cables, conductor, construction, damping, decommissioned, energy, erect, erection, evd, extra-high-voltage, field, fitter, fitters, grid, height, high, infrastructure, kilovolt, kv, landfill, lattice, line, lines, modules, network, neuss, operator, overhead, panels, park, photovoltaic, plant, pole, power, pylon, pylons, regenerative, renewable, rhineland, roof, route, site, skilled, solar, spacer, station, steel, supply, transmission, trolley, voltage, workers