. Proceedings of the annual convention . in. in ,36-in bars. 13. Finish (Present Art. 14)No change. 14. Marking and Stamping(Substitute for present Art. 15) The name or brand of the manufacturer, the section designation, and the year ofmanufacture shall be rolled in raised letters and figures on the side of the rolled bars,and a portion of this marking shall appear on each finished joint bar. A serial numberrepresenting the heat shall be hot stamped on the outside of the web of each bar, nearone end. 15. Inspection (Present Art. 16)No change. 16. Rejection (Substitute for present Art. 17) (a)


. Proceedings of the annual convention . in. in ,36-in bars. 13. Finish (Present Art. 14)No change. 14. Marking and Stamping(Substitute for present Art. 15) The name or brand of the manufacturer, the section designation, and the year ofmanufacture shall be rolled in raised letters and figures on the side of the rolled bars,and a portion of this marking shall appear on each finished joint bar. A serial numberrepresenting the heat shall be hot stamped on the outside of the web of each bar, nearone end. 15. Inspection (Present Art. 16)No change. 16. Rejection (Substitute for present Art. 17) (a) Unless otherwise specified, any rejection based on tests made in accordancewith Art. 7 shall be reported to the manufacturer within five working days from thereceipt of samples by the purchaser. 1184 Rail (b) Material that shows injurious defects subsequent to its acceptance at the manu-facturers works will be rejected, and the manufacturer shall be notified. 17. Rehearing (Present Art. 18)No change. Exhibit B Head easement .031to .062.


Size: 1407px × 1776px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookauthoramericanrailwayengine, bookcentury1900, bookdecade1900