A team from Bright Canyon Energy stand for a photo during a groundbreaking ceremony, May 19, 2022, for an energy resilience project at Joint Forces Training Base in Los Alamitos, California. The project, which will be constructed, owned and operated by Bright Canyon Energy, will generate 26 megawatts of solar photovoltaics, and will include a battery energy storage system, backup generators and a microgrid control system. The project enhances the installation’s energy resilience by providing power for critical missions for a minimum of two weeks during electrical grid outages. The project supp


A team from Bright Canyon Energy stand for a photo during a groundbreaking ceremony, May 19, 2022, for an energy resilience project at Joint Forces Training Base in Los Alamitos, California. The project, which will be constructed, owned and operated by Bright Canyon Energy, will generate 26 megawatts of solar photovoltaics, and will include a battery energy storage system, backup generators and a microgrid control system. The project enhances the installation’s energy resilience by providing power for critical missions for a minimum of two weeks during electrical grid outages. The project supports the Army Climate Strategy goal to build a microgrid on every installation by 2035.


Size: 5472px × 3648px
Photo credit: © Operation 2022 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: army, base, bright, canyon, energy, forces, groundbreaking, joint, oei, solar, training