. The Street railway journal . SWING BRIDGE—HAARLEM When the work was at its height on the entire line, there werein use 2360 laborers, two steam locomotives, one electric loco-motive, thirty-one steam pile drivers, three steam spouters, onesteam crane, sixty hand pile drivers, one steam bucket riggerand 165 flatboats and scows. TRACK CONSTRUCTION The permanent way along the Government High Road, andalso along the private right of way, is practically a steam rail-way construction. The rails are what is known as the Vignole(or T) section, weighing 70 lbs. per yard. The section is thestandard of


. The Street railway journal . SWING BRIDGE—HAARLEM When the work was at its height on the entire line, there werein use 2360 laborers, two steam locomotives, one electric loco-motive, thirty-one steam pile drivers, three steam spouters, onesteam crane, sixty hand pile drivers, one steam bucket riggerand 165 flatboats and scows. TRACK CONSTRUCTION The permanent way along the Government High Road, andalso along the private right of way, is practically a steam rail-way construction. The rails are what is known as the Vignole(or T) section, weighing 70 lbs. per yard. The section is thestandard of the American Society of Civil Engineers for thatweight. The rails rest directly on ties spaced 76 cm center tocenter, except at the joints, where they are 50 cm. The joints are. DOUBLE-TRACK ROAD ON NARROW -HAARLEM CAR HOUSE—HAARLEM ditches lead to various points where wind mills are placed topump water from the low levels up into the canals. The paving of the High Road was practically relaid the en-tire length to the stipulated datum level of Amsterdam. Theamount of work involved on the Government High Road maybe seen from the following list of material required:20,500 uncreosoted and 23,000 creosoted ,700 cubic meters uncreosoted and 1900 cubic meters creosotedtimber. 160 tons of iron for tie-rods. staggered. The ties are creosoted Norway pine, 23 cm x , the upper edges being beveled. The. rails are fastened tothe ties by screw bolts. Double concealed bonds are placed ateach joint. The length of route along the canal is 13417 km. At the village of Halfweg, which, as its name indicates, issituated approximately half-way between Amsterdam andHaarlem, the line crosses two canals. Over these, bridges werebuilt specially for the purposes of the tr


Size: 1931px × 1294px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1800, bookdecade1880, booksubjectstreetr, bookyear1884