Ontario Sessional Papers, 1920, . Extension to the Ontario Power Company. Extension to the Ontario Power Company 1920 HYDRO-ELECTRIC POWER COMMISSION TU of the Long Sault. Artificial features are being tied in and related to the variouscontours. Metering parties have been engaged in obtaining information on theriver flow, an operation entailing a great deal of hard work, as the river is splitinto many small channels which affect the flow. Studies relative to variousschemes of power development have been made and the calculation of back watereffect from the proposed works is under way.
Ontario Sessional Papers, 1920, . Extension to the Ontario Power Company. Extension to the Ontario Power Company 1920 HYDRO-ELECTRIC POWER COMMISSION TU of the Long Sault. Artificial features are being tied in and related to the variouscontours. Metering parties have been engaged in obtaining information on theriver flow, an operation entailing a great deal of hard work, as the river is splitinto many small channels which affect the flow. Studies relative to variousschemes of power development have been made and the calculation of back watereffect from the proposed works is under way. Extensive drilling operations are inprogress at Cat Island and Morrisburg, in order that accurate information may beobtained with regard to the rock strata. NIAGARA SYSTEM POWER CONSTRUCTIONOntario Power Company Extension During the past year the power house of the Ontario Power Company hasbeen enlarged as outlined in last years Report to accommodate two new machinesof 20,000 horse-power rated capacity. This installation involved the excavationof cubic yards of materia
Size: 1948px × 1283px
Photo credit: © The Reading Room / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: ., bookauthorontariol, bookcentury1900, bookdecade1920, bookyear1920