. The design of a hydro-electric plant at Ottawa, Illinois . 32. oarie shaft. Cost of the Turbines,Each unit will cost $29 ,^00,including the settinr; and the labor, thecost cones \vp to $35,000. This vfas the price that the Lockport units of six units,complete $210, of the two turbine units 7, Total cost of turbinc^s $217, of the six Lonbard governors for the large units, ^Six at $3,000 each 18, above includes the cost of installation for all the machinery andaccessories. Each turbine unit that drives the main generator v;eighs 90 weig


. The design of a hydro-electric plant at Ottawa, Illinois . 32. oarie shaft. Cost of the Turbines,Each unit will cost $29 ,^00,including the settinr; and the labor, thecost cones \vp to $35,000. This vfas the price that the Lockport units of six units,complete $210, of the two turbine units 7, Total cost of turbinc^s $217, of the six Lonbard governors for the large units, ^Six at $3,000 each 18, above includes the cost of installation for all the machinery andaccessories. Each turbine unit that drives the main generator v;eighs 90 weight of the euciter turbines will be about 10 tons each. The costof machinery and installation v/as figured frorr. a;ttu obtaine. from theS. Morgan Smith Co. which allows from $ to $ a ton for the work. One of the main objects in the decision of the size of units andthe ty^e v/as to obtain something that ;7as of standard size thereby &OV er TV or. >3N-orv:;-1 HO OD


Size: 1413px × 1768px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1900, bookdecade1910, booksubjecthy, booksubjecttheses