. Mining and Scientific Press . development work totaling 261ft.; the main cress-cut on the 1 1111 level was advanced IRaise Mo 1017 from the loth level Is now In shipping oigood grade a new raise Is being started from the 10thlevel to follow the same Btreak aa thai being developed bjraise No. 1017 South drift No. 913 is still following oore. as is also drill No i shad was not advi during the past week, as lateral work on the first, third levels prevented work In the bottom. The tllevel station was completed, and the first- and second-levelore-pockets were boled through. Mill constr


. Mining and Scientific Press . development work totaling 261ft.; the main cress-cut on the 1 1111 level was advanced IRaise Mo 1017 from the loth level Is now In shipping oigood grade a new raise Is being started from the 10thlevel to follow the same Btreak aa thai being developed bjraise No. 1017 South drift No. 913 is still following oore. as is also drill No i shad was not advi during the past week, as lateral work on the first, third levels prevented work In the bottom. The tllevel station was completed, and the first- and second-levelore-pockets were boled through. Mill construction is continuing steadily with a normal i i il n|; \in i \ ipen. An oi d by the Tram Co. with tie nil. Ne\l ll all the ? minal I. i • - • I i p of mine- in. hiding the Mineral Polnl tunnel in tin Id to i he Hoi k mi Co of Dei headed by a woman who Is I nin. in in mining and tl circles of the soutlthe Blind Tom and Baltimover-lead ore; Cripple Creek. September production ti toot with an bullion value of. The Mill oi the Miami Copper <•., wiib the International in the Background crew at work. Production of shipping ore was maintainedat the customary rate of 4 40 tons for the week, all beingsent to the Selby smelter. The Randsburg Silver company advanced its faces 19 4 the 25 days ended October 3. Development alongthe vein 210 ft. east of the shaft is advancing to both thenorth and south, showing both shipping and milling work at present is confined to the 500-ft. level. Thesouth-west cross-cut has cut a vein that is believed to bethe same as that which the 9th level of the California SilverRand is following. Redding.—The option to purchase the Jacob Brothershydraulic mine below Junction City has been extended bycourt order until October 1925. The option is held byW. H. Metson of San Francisco. The price is $21, Jacob brothers, Henry and John, have been dead forseveral years. The administrator has not been able totra


Size: 1852px × 1349px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1900, bookdecade1900, booki, bookpublishersanfrancisco