PATUXENT RIVER (Jan. 15, 2020) - The team responsible for helping to meet the NAVFAC Washington Runway Repairs Project deadline pose on Runway 6/24 at NA Patuxent River. From left, George Erskine, engineering tech; Lt. Christina Milone, construction manager; Larry Dong, engineering tech; Jim Fletcher, Pax River Air Operations airfield manager; and Eddie Bowles, engineering tech. Both primary runways at NAS Patuxent River had undergone extensive repairs since the project began in 2015. ( Navy photo by Patrick Gordon)


Size: 1936px × 1291px
Photo credit: © Operation 2021 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: