Annual report 1912 . Diagram of 2,200 Volt Pole Top men, each consisting of a foreman, time-keeper and from fifteen to twenty Construction Department also located the lines, surveyed private right of wayand superintended the construction of these lines. 1913 THE HYDRO-ELECTRIC POWER COMMISSION. 37 Right of Way The Right of Way Department secured easements for the right to place polesand anchors on approximately miles of private property, and made agree-ments with the owners of property abutting highways for the right to trim alltrees so as to give a clearance of 10 ft. between a


Annual report 1912 . Diagram of 2,200 Volt Pole Top men, each consisting of a foreman, time-keeper and from fifteen to twenty Construction Department also located the lines, surveyed private right of wayand superintended the construction of these lines. 1913 THE HYDRO-ELECTRIC POWER COMMISSION. 37 Right of Way The Right of Way Department secured easements for the right to place polesand anchors on approximately miles of private property, and made agree-ments with the owners of property abutting highways for the right to trim alltrees so as to give a clearance of 10 ft. between all foliage and the transmissionline Diagram of 13,200 Volt Pole Top tions Standard Construction All wood pole lines have been constructed in accordance with standard specifica-The accompanying drawings show the standard arrangement for 2,200 38 FIFTH ANNUAL REPORT OF No. 47 volt, 13,200 volt and 22,000 pole tops. The construction employed is generally asfollows:—for 2,200 volt distributing lines 30 ft. native cedar poles, with 4 or6 pin cross arms, locust top pins, porcelain insulators, and bare or copperwire; for 13,200 volt lines 40 ft. Idaho Cedar poles, with 4 and 2 pin Georgia


Size: 1398px × 1786px
Photo credit: © The Reading Room / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1900, bookdecade1910, bookidannualreport, bookyear1912