. Case histories of Corps breakwater and jetty structures. Breakwaters; Jetties; Breakwaters; Jetties. HARBOR SIDE OCEAN SIDE 15 FT â ONE LA YER, 8 TON MINIMUM KEYED AND FITTED + 13 FT. Figure 6. Kahului breakwater construction of 1913 (typical cross section) 16. Please note that these images are extracted from scanned page images that may have been digitally enhanced for readability - coloration and appearance of these illustrations may not perfectly resemble the original Sargent, Francis E; Markle, Dennis G; Grace, Peter J; U. S. Army Engineer Waterways Experiment Station; Coastal Eng


. Case histories of Corps breakwater and jetty structures. Breakwaters; Jetties; Breakwaters; Jetties. HARBOR SIDE OCEAN SIDE 15 FT â ONE LA YER, 8 TON MINIMUM KEYED AND FITTED + 13 FT. Figure 6. Kahului breakwater construction of 1913 (typical cross section) 16. Please note that these images are extracted from scanned page images that may have been digitally enhanced for readability - coloration and appearance of these illustrations may not perfectly resemble the original Sargent, Francis E; Markle, Dennis G; Grace, Peter J; U. S. Army Engineer Waterways Experiment Station; Coastal Engineering Research Center (U. S. ); United States. Army. Corps of Engineers; Repair, Evaluation, Maintenance, and Rehabilitation Research Program. [Vicksburg, Miss. : U. S. Army Engineer Waterways Experiment Station ; Springfield, Va. : available from National Technical Information Service]


Size: 2736px × 913px
Photo credit: © Book Worm / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., boo, bookauthorunitedstatesarmycorpsofengineers, bookcentury1900