. Tentative revised boiler safety orders. Fig. 2 The BendTest for Eivets Tig. 3 The Flat-tening Test fobRivets III Inspection and Eejection 61 Inspection. The inspector representing the purchaser shallhave free entry, at all times while work on the contract of the pur-chaser is being performed, to all parts of the manufacturers workswhich concern the manufacture of the rivets ordered. The manu-facturer shall afford the inspector, free of cost, all reasonable facilitiesto satisfy him that the rivets are being furnished in. accordance withthese specifications. AH tests and inspection shall be ma


. Tentative revised boiler safety orders. Fig. 2 The BendTest for Eivets Tig. 3 The Flat-tening Test fobRivets III Inspection and Eejection 61 Inspection. The inspector representing the purchaser shallhave free entry, at all times while work on the contract of the pur-chaser is being performed, to all parts of the manufacturers workswhich concern the manufacture of the rivets ordered. The manu-facturer shall afford the inspector, free of cost, all reasonable facilitiesto satisfy him that the rivets are being furnished in. accordance withthese specifications. AH tests and inspection shall be made at theplace of manufacture prior to shipment, unless otherwise specified,and shall be so conducted a$ not to interfere imnecessarily with theoperation of the works. 62 Rejection. Rivets which show injurious defects subsequentto their acceptance at the manufacturers works will be rejected, andthe manufacturer shall be notified. NEW INSTALLATIONS, PART I, SECTION I, POWER BOILERS 19 SPECIFICATIONS FOR STAYBOLT STEEL REQUIREMENTS FOR ROL


Size: 1399px × 1785px
Photo credit: © The Reading Room / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1900, bookdecade1910, booksubjectsteambo, bookyear1919