Tuberculosis hospital and sanatorium construction; . for lockers, toilet rooms and storage large wards are an objection to using the plan for this building, but they could bedivided, and it is easy to administer. It would also be improved by dividing the lockerrooms, bath rooms, and toilets on the main floor into two sections, providing a nursesoffice, one or two more pri\ate rooms, a larger sun room, and larger wards, gi\dng moreair space to each patient. The building has a capacity for seventy patients, and cost $17,600. Boston Consumptives Hospital, Boston, Mass., Cottage tor A
Tuberculosis hospital and sanatorium construction; . for lockers, toilet rooms and storage large wards are an objection to using the plan for this building, but they could bedivided, and it is easy to administer. It would also be improved by dividing the lockerrooms, bath rooms, and toilets on the main floor into two sections, providing a nursesoffice, one or two more pri\ate rooms, a larger sun room, and larger wards, gi\dng moreair space to each patient. The building has a capacity for seventy patients, and cost $17,600. Boston Consumptives Hospital, Boston, Mass., Cottage tor AdvancedCases (Illustration 57;. This is a frame building with a shingle roof, placed on a concretefoundation and concrete piers. The interior walls are plastered and the floors are offirst quality maple. The building is 144 feet long and 25 feet through the wards, includingthe porches, with a rear extension 45 feet deep and 28 feet mde. At the front in the centreis an assembly room 22 feet wide by 24 feet deep and in the rear extension an emergency.
Size: 2549px × 980px
Photo credit: © The Reading Room / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: ., bookcentury1900, bookdecade1910, bookpu, booksubjecthealthresorts